China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green

Product Details
Customization: Available
After-sales Service: Quality Warranty
Warranty: Quality Warranty
Manufacturer/Factory, Trading Company, Group Corporation

360° Virtual Tour

Diamond Member Since 2008

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Multi-language Pioneer
5 languages freely used by foreign trade staff. include: English, Japanese, German, Italian, French
to see all verified strength labels (18)
  • China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
  • China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
  • China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
  • China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
  • China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
  • China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
Find Similar Products

Basic Info.

Model NO.
Green Formwork
Material
Steel
Type
Slab Formwork
Material.
Aluminium
Surface
Aluminium
Brand
GF
Place of Origin
China
Transport Package
Boxing
Specification
1812 189
Trademark
GF
Origin
China
Production Capacity
400tons/Month

Product Description

Qingdao Scaffolding I&E Co., Ltd. and Qingdao Formwork International Co.,Ltd. are one of the biggest manufacturer in whole China for Scaffolding systems and Formwork Systems.

All our products are made as per European standard, American standard and Australian standard.

For more than 20 years, our products are widely used in the mining, construction, petrochemical and even industries all over the world:especially in whole Europe, Australia, New Zealand, U.S.A., Canada , South American countries and Southeast Asia countries.

We have opened 5 branch companies in Germany( Round GMBH),Australia (Round Scaffolding Pty Ltd.), Sweden(RILLCO),USA(Round Formwork and Scaffolding Inc),Cambodia(Round Formwork and Scaffoldings Co.,Ltd), and 5 foreign offices: In France(QingDao Scaffolding Co.,Ltd),Brazil(QingDao Scaffolding Group ),Burma(QingDao Scaffolding Group),Indonesia(QingDao Scaffolding Group),Vietnam(QingDao Scaffolding Group).


China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props GreenChina CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green
Panel - Prop early stripping Green Formwork System  -  Aluminium Formwork / Steel Formwork

Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world.  We call it Green Formwork-- Panel-Prop Early Stripping System . 

It has unbeatable advantages. 
 

SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple.  With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.

 
There are 3 basic components in Green Formwork System,do not require braces:
 

1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool

 
Item Item specification unit weight
Aluminium Panel MB1812 1.8X1.2M 43
MB189 1.8X0.9M 37
MB186 1.8X0.6M 29
MB1512 1.5X1.2M 39.4
MB159 1.5X0.9M 31.3
MB156 1.5X0.6M 23.8
MB1212 1.2X1.2M 32
MB129 1.2X0.9M 26
MB126 1.2X0.6M 21
MB99 0.9X0.9M 21
MB96 0.9X0.6M 17
MB66 0.6X0.6M 12.3

Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
 
If you have projects in hand ,please do not hesitate to contact us.
We are committed to Excellent Services, Innovation & Quality Enhancement.

China CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props GreenChina CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props GreenChina CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props GreenChina CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props GreenChina CE Approved Plastic Inflatable Rubber Yellow Panel Formwoork Shear Wall Formwork Props Green




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier