Secured Trading Service

Quick Release Masonry Steel Slab Formwork for Concrete Construction

Qingdao Scaffolding Import and Export Co., Ltd.
  • Audited Supplier
  • 19 yrs
  • leading factory

Contact Supplier

Still deciding? Get samples of $ !
Order Sample

Product Highlights

  • Early Stripping Mechanism: Advanced system allowing quick panel removal to shorten construction periods.
  • High Erection Efficiency: Installation speed reaches 60-100 square meters per person per day.
  • Enhanced Safety Stability: Independent table design with 6-direction moving restriction ensures stability.
  • Reduced Total Cost: Fewer panels required, lowering transportation and storage expenses.
  • Minimal Operator Requirement: A team of 3-4 workers can quickly set up and remove panels.
  • Green Construction Concept: Developed over 10 years based on eco-friendly construction principles.
  • Simple Component Structure: Consists of only 3 basic components without requiring braces.
  • Patent Certified Technology: Features a patented puzzle-style system for solid safety and efficiency.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Quick Release Masonry Steel Slab Formwork for Concrete Construction

Quick Release Masonry Steel Slab Formwork for Concrete Construction
Quick Release Masonry Steel Slab Formwork for Concrete Construction pictures & photos
Quick Release Masonry Steel Slab Formwork for Concrete Construction
Quick Release Masonry Steel Slab Formwork for Concrete Construction pictures & photos
Quick Release Masonry Steel Slab Formwork for Concrete Construction
Quick Release Masonry Steel Slab Formwork for Concrete Construction pictures & photos
Quick Release Masonry Steel Slab Formwork for Concrete Construction
Quick Release Masonry Steel Slab Formwork for Concrete Construction pictures & photos
Quick Release Masonry Steel Slab Formwork for Concrete Construction
Quick Release Masonry Steel Slab Formwork for Concrete Construction pictures & photos
Quick Release Masonry Steel Slab Formwork for Concrete Construction
Quick Release Masonry Steel Slab Formwork for Concrete Construction pictures & photos
Quick Release Masonry Steel Slab Formwork for Concrete Construction
  • Quick Release Masonry Steel Slab Formwork for Concrete Construction
  • Quick Release Masonry Steel Slab Formwork for Concrete Construction
    Quick Release Masonry Steel Slab Formwork for Concrete Construction
  • Quick Release Masonry Steel Slab Formwork for Concrete Construction
    Quick Release Masonry Steel Slab Formwork for Concrete Construction
  • Quick Release Masonry Steel Slab Formwork for Concrete Construction
    Quick Release Masonry Steel Slab Formwork for Concrete Construction
  • Quick Release Masonry Steel Slab Formwork for Concrete Construction
    Quick Release Masonry Steel Slab Formwork for Concrete Construction
  • Quick Release Masonry Steel Slab Formwork for Concrete Construction
    Quick Release Masonry Steel Slab Formwork for Concrete Construction
  • Quick Release Masonry Steel Slab Formwork for Concrete Construction
    Quick Release Masonry Steel Slab Formwork for Concrete Construction

Find Similar Products

Product Description

Panel - Prop early stripping Green Formwork System - Steel Formwork

Based on the concept of Green Construction, after the study of 10 years, we have developed the Panel-Prop formwork system with early stripping mechanism. It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety. It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System. 

It has unbeatable advantages. 

SAFE -The independent table with 6 directions moving restriction. It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism, it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day. 
REDUCED TOTAL COST - Thanks to the early stripping mechanism, the number of panels becomes less and the cost, transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels. 

There are 3 basic components in Green Formwork System, do not require braces

1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool

Through the combination of panels, aux beams and bridge beam, the system deals with complex slab structure by very simple way. 

If you have projects in hand, please do not hesitate to contact us. 
Quick Release Masonry Steel Slab Formwork for Concrete Construction
Quick Release Masonry Steel Slab Formwork for Concrete Construction





Dimensions of Panel
 
Items Model Specifications Unit Area(m2)
Panel MB1812 1.8X1.2M 2.16
MB189 1.8X0.9M 1.62
MB186 1.8X0.6M 1.08
MB1212 1.2X1.2M 1.44
MB129 1.2X0.9M 1.08
MB126 1.2X0.6M 0.72
MB99 0.9X0.9M 0.81
MB96 0.9X0.6M 0.54
MB66 0.6X0.6M 0.36


Erection Instruction 

Quick Release Masonry Steel Slab Formwork for Concrete Construction


 
Company Introduction

Our company "QINGDAO SCAFFOLDING Co., Ltd. " is one of the biggest manufacturers in whole China
For scaffolding products and formwork items. We export large quantity to Europe, Australia, New Zealand, U. S. A., Canada, South America and African countries. More than 20 years experience of manufacturing on scaffolding has won our customers approval and satisfaction.  
 
Please be advised the main products which we are producing: 
1)SCAFFOLDING COUPLERS; 
2)SCREW JACKS; 
3)RINGLOCK SYSTEMS; 
4)KWIKSTAGE SYSTEMS; 
5)HAKI SYSTEMS; 
6)PROPS
7)FORMWORK AND FORMWORK ACCESSORIES; 
8)SCAFFOLD TUBES(PIPES)
9)STEEL FORMWORK

If you have any inquiry about scaffolding or formwork products, please feel free to contact me. 


------------------
Cherry Wei
Sales Representative
Qingdao Formwork International Co., Ltd.

About the Supplier

This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR255206". Items marked "verified" are certified.

Watch Video
Watch Video
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.

About Our Factory & Business Background

Address
Room 2206.2210, Century Mansion, 39 Donghaixi Road, Qingdao,China.
Terms of Payment
LC, T/T
International Commercial Terms(Incoterms)
FOB, CFR, CIF, DDP
Average Lead Time
Peak Season Lead Time, 1-3 months, Off Season Lead Time, one month
Nearest Port
Qingdao, Tianjin, Shanghai

Our Production Capability & Technical Expertise

Main Products
Formwork, Slab Formwork, Scaffolding, Scaffold, Concrete Shoring, Wall Formwork, Column Formwork, Steel Props, Deck Formwork, Shoring

Our Industry Experience & Global Business Record

Export Year
2003-09-10
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe

FAQ

What is the erection speed of this system?
The erection speed is as high as 60-100 square meters per person per day.
How many workers are needed to operate the system?
Only 3-4 workers in a team are required to quickly and easily set up and remove the panels.
What are the main components of the Green Formwork System?
The system includes 3 basic components: Panel with plywood faced on top of a steel frame, Prop with early stripping mechanism, and Assembly/Disassembly Tool.
Does the system require braces for installation?
No, the system does not require braces as it consists of only 3 basic components.
What is the lead time for this product?
The lead time is 1-3 months during peak season and one month during the off-season.
What payment terms are accepted?
We accept LC and T/T as terms of payment.
What are the available panel dimensions?
Available sizes include 1.8x1.2M, 1.8x0.9M, 1.8x0.6M, 1.2x1.2M, 1.2x0.9M, 1.2x0.6M, 0.9x0.9M, 0.9x0.6M, and 0.6x0.6M.
Where is the nearest port for shipping?
The nearest ports are Qingdao, Tianjin, and Shanghai.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now