• Steel and Aluminum Green Formwork for Slab Concrete
  • Steel and Aluminum Green Formwork for Slab Concrete
  • Steel and Aluminum Green Formwork for Slab Concrete
  • Steel and Aluminum Green Formwork for Slab Concrete
  • Steel and Aluminum Green Formwork for Slab Concrete
  • Steel and Aluminum Green Formwork for Slab Concrete

Steel and Aluminum Green Formwork for Slab Concrete

After-sales Service: Graphic Design, Total Solution for Projects
Warranty: More That 5 Years
Certification: Patent Certificate
Material: Aluminum
Type: Slab Formwork
Usage: Concorete Panels Shuttering Formwork
Customization:
Diamond Member Since 2008

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
MB1812-MB606
Transport Package
Pallet
Specification
1.8x1.2M-0.6X0.6M
Trademark
GF
Origin
China
Production Capacity
10000m2/Per Month

Product Description




Steel and Aluminum Green Formwork for Slab ConcreteSteel and Aluminum Green Formwork for Slab ConcreteSteel and Aluminum Green Formwork for Slab Concrete
Steel and Aluminum Green Formwork for Slab Concrete
Product Description

Panel - Prop early stripping Green Formwork System  -  Aluminium Formwork / Steel Formwork

Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world.  We call it Green Formwork-- Panel-Prop Early Stripping System . 

It has unbeatable advantages. 
 

SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple.  With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.

 
There are 3 basic components in Green Formwork System,do not require braces:
 

1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool

 
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
 
If you have projects in hand ,please do not hesitate to contact us.
We are committed to Excellent Services, Innovation & Quality Enhancement.

Steel and Aluminum Green Formwork for Slab Concrete
Steel and Aluminum Green Formwork for Slab Concrete
Steel and Aluminum Green Formwork for Slab ConcreteSteel and Aluminum Green Formwork for Slab Concrete

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2008

Suppliers with verified business licenses

Trading Company
Number of Employees
33
Year of Establishment
2003-09-10