Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,and for the study of 10 years,we have developed the panel-prop system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System to you.
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - Group together in fours, quick and easy to set up these tables.
There are 3 basic components in Green Formwork System:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.