Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
Product Details
| Customization: | Available |
|---|---|
| Certification: | Patent Certificate |
| Material: | Steel Wood |
Diamond Member Since 2008
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Importers and Exporters
High Repeat Buyers Choice
Years of Export Experience
Multi-language Pioneer
The supplier has import and export rights
More than 50% of buyers repeatedly choose the supplier
The export experience of the supplier is more than 10 years
2 languages freely used by foreign trade staff. include: English, Japanese
Sign In to see all verified strength labels (26)
Find Similar Products
Basic Info.
- Model NO.
- QS GF
- Type
- Slab Formwork
- Transport Package
- in Bundle or Others
- Specification
- Different sizes
- Trademark
- QS GF
- Origin
- Shandong, China
- HS Code
- 7308
- Production Capacity
- 400 Tons / Month
Product Description
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.

Company Introduction
Our company "QINGDAO SCAFFOLDING CO.,LTD." is one of the biggest manufacturers in whole China
If you have any inquiry about scaffolding or formwork products,please feel free to contact me.
QINGDAO SCAFFOLDING CO.,LTD.
Best Regards/Cherry Wei
M: 0086-13355422605
TEL: +86-532-8668 1339
FAX: +86-532-8579 8559
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
Panel - Prop early stripping Green Formwork System - Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.

Company Introduction
Our company "QINGDAO SCAFFOLDING CO.,LTD." is one of the biggest manufacturers in whole China
for scaffolding products and formwork items. We export large quantity to Europe, Australia, New Zealand, U.S.A., Canada, South America and African countries. More than 20 years experience of manufacturing on scaffolding has won our customers approval and satisfaction.
Please be advised the main products which we are producing:
1)SCAFFOLDING COUPLERS;
2)SCREW JACKS;
3)RINGLOCK SYSTEMS;
4)KWIKSTAGE SYSTEMS;
5)HAKI SYSTEMS;
6)PROPS
7)FORMWORK AND FORMWORK ACCESSORIES;
8)SCAFFOLD TUBES(PIPES)
9)STEEL FORMWORK
If you have any inquiry about scaffolding or formwork products,please feel free to contact me.
QINGDAO SCAFFOLDING CO.,LTD.
Best Regards/Cherry Wei
M: 0086-13355422605
TEL: +86-532-8668 1339
FAX: +86-532-8579 8559
Send your message to this supplier
People who viewed this also viewed
Product Groups
Find Similar Products By Category
- Supplier Homepage
- Products
- Concrete Formwork System
- Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
Related Categories
Hot Searches
More