Tower QS Metal Pallets 2m/3.6m, 1.75m/3m, 2.2m/4m Wholesale Used Scaffolding Steel Props
Product Details
| Customization: | Available |
|---|---|
| After-sales Service: | Quality Warranty |
| Warranty: | Quality Warranty |
Diamond Member Since 2008
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Importers and Exporters
High Repeat Buyers Choice
Years of Export Experience
Multi-language Pioneer
The supplier has import and export rights
More than 50% of buyers repeatedly choose the supplier
The export experience of the supplier is more than 10 years
%s1 languages freely used by foreign trade staff. include: %s2
Sign In to see all verified strength labels (26)
Find Similar Products
Basic Info.
- Model NO.
- Green Formwork
- Material
- Steel
- Type
- Fixed
- Structural Style
- Tower Scaffolding
- Framework
- Frame Combined Scaffolding
- Supporting Mode
- Projecting Scaffolding
- Lapping Form
- High Formwork
- Erection Position
- Internal Scaffolding
- Move Method
- Attached Lifting Scaffolding
- Scaffolding Part Type
- Scaffolding Props
- Construction Properties
- Building Scaffold
- Material.
- Steel, Aluminium, Plywood
- Surface
- Hot Dipped Galvanized, Powder Coated
- Brand
- QS
- Place of Orgin
- China
- Transport Package
- Metal Pallets
- Specification
- 2m/3.6m, 1.75m/3m, 2.2m/4m
- Trademark
- QS
- Origin
- China
- HS Code
- 73084000
- Production Capacity
- 2000tons/Year
Product Description
Green Formwork ,with technology from Canada,with drop head mechanism,is the BEST slab formwork systems in the world in recent 15 years.
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
Qingdao Scaffolding I&E Co., Ltd. and Qingdao Formwork International Co.,Ltd. are one of the biggest manufacturer in whole China for Scaffolding systems and Formwork Systems.
All our products are made as per European standard, American standard and Australian standard.
For more than 20 years, our products are widely used in the mining, construction, petrochemical and even industries all over the world:especially in whole Europe, Australia, New Zealand, U.S.A., Canada , South American countries and Southeast Asia countries.
We have opened 5 branch companies in Germany( Round GMBH),Australia (Round Scaffolding Pty Ltd.), Sweden(RILLCO),USA(Round Formwork and Scaffolding Inc),Cambodia(Round Formwork and Scaffoldings Co.,Ltd), and 5 foreign offices: In France(QingDao Scaffolding Co.,Ltd),Brazil(QingDao Scaffolding Group ),Burma(QingDao Scaffolding Group),Indonesia(QingDao Scaffolding Group),Vietnam(QingDao Scaffolding Group).


Green Formwork:
Panel - Prop early stripping Green Formwork System - Aluminium Formwork / Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
| Item | Item | specification | unit weight |
| Aluminium Panel | MB1812 | 1.8X1.2M | 43 |
| MB189 | 1.8X0.9M | 37 | |
| MB186 | 1.8X0.6M | 29 | |
| MB1512 | 1.5X1.2M | 39.4 | |
| MB159 | 1.5X0.9M | 31.3 | |
| MB156 | 1.5X0.6M | 23.8 | |
| MB1212 | 1.2X1.2M | 32 | |
| MB129 | 1.2X0.9M | 26 | |
| MB126 | 1.2X0.6M | 21 | |
| MB99 | 0.9X0.9M | 21 | |
| MB96 | 0.9X0.6M | 17 | |
| MB66 | 0.6X0.6M | 12.3 |
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.
We are committed to Excellent Services, Innovation & Quality Enhancement.








Send your message to this supplier
People who viewed this also viewed
Product Groups
Find Similar Products By Category
- Supplier Homepage
- Products
- Props / Shoring systems
- Tower QS Metal Pallets 2m/3.6m, 1.75m/3m, 2.2m/4m Wholesale Used Scaffolding Steel Props
Related Categories
Hot Searches
More