Slab Steel GF Shoring Prop Horizon Formwork Easy Set up
Contact Supplier
Product Highlights
- Early Stripping Process: Advanced panel-prop system allows for early stripping operations to accelerate project timelines.
- Simple Installation: Uses puzzle-style systematic approach with no cross braces or tripods required.
- High Efficiency: A 3-4 worker team can complete 60-80 square meters of work per man per day.
- Enhanced Safety: Features 6-direction locking restriction and eliminates need for human lifting above shoulder.
- Versatile Material: Constructed from steel frames and bamboo plywood for durable concrete formwork.
- Patent Certified: System is backed by a valid Patent Certificate ensuring proprietary technology.
- Global Application: Proven usage in USA, Canada, Europe, Australia, and Southeast Asian countries.
- Easy Transfer: Components are designed for easy horizontal and vertical transfer on site.
Product Attributes
- Customization
- Available
- Certification
- Patent Certificate
- Material
- Steel
- Model NO.
- MB1812
- Type
- Slab Formwork
- Transport Package
- Pallet
- Specification
- 1.8x1.2M-0.6X0.6M
- Trademark
- GF
- Origin
- China
- Production Capacity
- 10000m2/Per Month
Product Images of Slab Steel GF Shoring Prop Horizon Formwork Easy Set up
Find Similar Products
Product Description
Green Formwork is an advanced Panel -Prop formwork system which allows EARLY STRIPPING PROCESS. It provides a suitable formwork solution to most concrete structures and components and meets the general requirements of different construction methods and conditions.
The system adopts the structural mechanism of a 4-leg table using a puzzle-style & systematic installation approach.
Product Description
to the flat slab or beam-less structure projects
An advanced aluminium/steel panel prop formwork system allows early stripping operation. It provides suitable formwork solutions for flat slab or beam-less concrete structure projects.
Simple & Innovative
√ Only a few components: Panel - Steel frames and bamboo plywood
Prop with quick release
√ Do not require cross braces and tripods
√ Easy to transfer both horizontally and vertically
Fast & Efficient :
√ 3-4 worker team for erection, stripping and removal
√ Can achieve 60-80m2 of work be done per man per day?
Safe & Reliable
√ A stable system with a 6-direction locking restriction
√ No human lifting above the shoulder required
Till now, Green Formwork has been used in the U.S.A ., Canada, Czech Republic, U.A.E, Malaysia, Indonesia, Philippines, Thailand, Burma, and Cambodia. Safe, efficient, easy operating and cost-effective.
Company
QINGDAO SCAFFOLDING CO., LTD." is the leading manufacturer and exporter in China of all kinds of scaffolding products and formwork systems. We export large quantities to Europe, Australia, New Zealand, the U.S.A., Canada, South America and African countries. More than 20 years of experience manufacturing scaffolding has won our customer's approval and satisfaction.
Please be advised and see the attached catalogue of the products which we are producing:
1)SCAFFOLDING TUBES AND COUPLERS;
2)SCREW JACKS;
3)RINGLOCK SYSTEMS;
4)KWIKSTAGE SYSTEMS;
5)HAKI SYSTEMS;
6)ADJUSTABLE STEEL PROPS
7)FORMWORK AND FORMWORK ACCESSORIES;
8)ALUMINIUM /STEEL FORMWORK
If you have any inquiries or any projects in hand, please feel free to contact me.
Amelie Xing
QINGDAO SCAFFOLDING CO., LTD.
About the Supplier
This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR255206". Items marked "" are certified.
Company Profile
Qingdao Scaffolding Import and Export Co., Ltd., has been manufacturing scaffolding and formwork products for more than 30 years, absolutely top 1 for high quality scaffolding and formwork products amoung all Chinese and Indian suppliers.
We are providing various products and solutions of slab formwork, wall formwork, formwork accessories, ringlock scaffolding, kwikstage scaffolding, haki scaffolding, scaffolding couplers, steel tubes and steel props.
All our products are made as per European standard, American standard and Australian standard.
For more than 20 years, our products are widely used in the mining, construction, petrochemical and even industries all over the world: Especially in whole Europe, Australia, New Zealand, U. S. A., Canada, South American countries and African countries.
Green Formwork is our invention patent formwork system. It is an effective replacement of conventional timber method for concrete construction. It has unbeatable advantage such as safety, high efficiency, and reduced construction cost and labor. Green Formwork system is simple and innovative. Till now, it has been used for more than 600 projects in USA, Canada, Czekh republic, Iraq, Malaysia, Indonesia, Philippines, Thailand, Burma, U. A. E, Cambodia.
About Our Factory & Business Background
- Address
- Room 2206.2210, Century Mansion, 39 Donghaixi Road, Qingdao,China.
- Terms of Payment
- LC, T/T
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, DDP
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month - Nearest Port
- Qingdao, Tianjin, Shanghai
Our Production Capability & Technical Expertise
- Main Products
- Formwork, Slab Formwork, Scaffolding, Scaffold, Concrete Shoring, Wall Formwork, Column Formwork, Steel Props, Deck Formwork, Shoring
Our Industry Experience & Global Business Record
- Export Year
- 2003-09-10
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe
FAQ
- What is the main advantage of this formwork system?
- It allows for an early stripping process, making it suitable for flat slab or beam-less structure projects.
- Does the system require cross braces or tripods?
- No, the system does not require cross braces and tripods due to its 4-leg table structural mechanism.
- How many workers are needed for erection and removal?
- A team of 3-4 workers is sufficient for erection, stripping, and removal operations.
- What is the daily work capacity per worker?
- The system can achieve 60-80 square meters of work done per man per day.
- Is the system safe to operate?
- Yes, it features a stable system with 6-direction locking restriction and requires no lifting above the shoulder.
- What materials are used in the Green Formwork?
- The system uses steel frames and bamboo plywood as its primary materials.
- What is the lead time for this product?
- The lead time is one month during the off-season and 1-3 months during the peak season.
- What payment terms are accepted?
- We accept LC (Letter of Credit) and T/T (Telegraphic Transfer) as terms of payment.
Send your message to this supplier
People who viewed this also viewed
-
US$75.00-105.00 / Square Meter
-
US$100.00-120.00 / Square Meter
-
US$85.00-110.00 / Square Meter
-
US$85.00-110.00 / Square Meter
-
US$99.00-130.00 / Piece
-
US$100.00 / Square Meter
-
US$78.00-128.00 / Square Meter
-
US$130.00-180.00 / Square Meter
-
US$59.00-98.00 / Square Meter
Find Similar Products By Category
- Supplier Homepage
- Products
- Concrete Formwork System
- Slab Steel GF Shoring Prop Horizon Formwork Easy Set up
Related Categories
Hot Searches
- China Aluminium Factories
- Aluminium Profile Factories
- Aluminium Alloy Products Factories
- Flat Products Factories
- Easy And Durable
- Aluminium Profile Products
- Aluminium Easy Frame
- Anodized Aluminium Products
- Hot Sale Plastic Products
- Top 10 Aluminium
- Aluminium Trends
- Easy Set up Bulkbuy