Secured Trading Service

Green Aluminium Formwork Concrete Mould Formwork with Drop Head

Qingdao Scaffolding Import and Export Co., Ltd.
  • Audited Supplier
  • 19 yrs
  • leading factory

Contact Supplier

Product Highlights

  • Early Stripping Capability: Advanced system allows for early stripping operations to accelerate project timelines.
  • High Efficiency Output: Achieves 60-80 square meters of work done per man per day with a 3-4 worker team.
  • No Cross Braces Required: System design eliminates the need for cross braces and tripods for stability.
  • Safe Operation: Stable 6-direction locking system with no human lifting required above shoulder height.
  • Versatile Material: Constructed with steel frames and bamboo plywood for durable slab formwork solutions.
  • Global Project Experience: Successfully deployed in USA, Canada, UAE, Malaysia, Indonesia, and other countries.
  • Certified Quality: Holds ISO certification and patent certificates for reliable performance.
  • Fast Delivery: Maintains plant warehouse stocks for quick delivery to international markets.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Green Aluminium Formwork Concrete Mould Formwork with Drop Head

Green Aluminium Formwork Concrete Mould Formwork with Drop Head
Green Aluminium Formwork Concrete Mould Formwork with Drop Head pictures & photos
Green Aluminium Formwork Concrete Mould Formwork with Drop Head
Green Aluminium Formwork Concrete Mould Formwork with Drop Head pictures & photos
Green Aluminium Formwork Concrete Mould Formwork with Drop Head
Green Aluminium Formwork Concrete Mould Formwork with Drop Head pictures & photos
Green Aluminium Formwork Concrete Mould Formwork with Drop Head
Green Aluminium Formwork Concrete Mould Formwork with Drop Head pictures & photos
Green Aluminium Formwork Concrete Mould Formwork with Drop Head
Green Aluminium Formwork Concrete Mould Formwork with Drop Head pictures & photos
Green Aluminium Formwork Concrete Mould Formwork with Drop Head
Green Aluminium Formwork Concrete Mould Formwork with Drop Head pictures & photos
Green Aluminium Formwork Concrete Mould Formwork with Drop Head
  • Green Aluminium Formwork Concrete Mould Formwork with Drop Head
  • Green Aluminium Formwork Concrete Mould Formwork with Drop Head
    Green Aluminium Formwork Concrete Mould Formwork with Drop Head
  • Green Aluminium Formwork Concrete Mould Formwork with Drop Head
    Green Aluminium Formwork Concrete Mould Formwork with Drop Head
  • Green Aluminium Formwork Concrete Mould Formwork with Drop Head
    Green Aluminium Formwork Concrete Mould Formwork with Drop Head
  • Green Aluminium Formwork Concrete Mould Formwork with Drop Head
    Green Aluminium Formwork Concrete Mould Formwork with Drop Head
  • Green Aluminium Formwork Concrete Mould Formwork with Drop Head
    Green Aluminium Formwork Concrete Mould Formwork with Drop Head
  • Green Aluminium Formwork Concrete Mould Formwork with Drop Head
    Green Aluminium Formwork Concrete Mould Formwork with Drop Head

Find Similar Products

Product Description

Green Aluminium Formwork Concrete Mould Doka Formwork with Certifications
#Green Formwork - perfect slab formwork solution for flatslab or beam-less structure projects 


An advance aluminium/steel panel prop formwork system which allow early stripping operation. It provides suitable formwork solutions to flatslab or beam-less concrete structure projects.

Simple & Innovative 

√ Only few components : Panel - Steel fames and bamboo plywood 
                                                Prop with quick release
                                      
√ Do not require cross braces and tripods

√ Easy to transfer both horizontally and vertically 



Fast & Efficient :

√ 3-4 worker team for erection,stripping and removal

√ Can acheive 60-80m2 work done per man per day .



Safe & Reliable

√ Stable system with 6 direction locking restriction

√ No human lifting above shoulder required 


Green Aluminium Formwork Concrete Mould Formwork with Drop Head
* Basic Components / Specification

 
Basic Components  Dimension Unit Weight 
Panel1812 1.8X1.2M 45kg
Prop with drop head 2.25-3.6M 23kg
Other accessories    


*Erection Instruction - Safe,fast and easy

Green Aluminium Formwork Concrete Mould Formwork with Drop Head


*Project samples

Till now, Green Formwork has been used in U.S.A ., Canada, Czekh republic,U.A.E, Malaysia, Indonesia,Philippines,Thailand,Burma, Cambodia.
Green Aluminium Formwork Concrete Mould Formwork with Drop Head
Green Aluminium Formwork Concrete Mould Formwork with Drop HeadGreen Aluminium Formwork Concrete Mould Formwork with Drop HeadGreen Aluminium Formwork Concrete Mould Formwork with Drop HeadGreen Aluminium Formwork Concrete Mould Formwork with Drop HeadGreen Aluminium Formwork Concrete Mould Formwork with Drop Head

*Plant warehouse ,stocks and quick delivery

Green Aluminium Formwork Concrete Mould Formwork with Drop Head

*Company 

QINGDAO SCAFFOLDING CO.,LTD." is the leading manufacturer and exporter in whole China for all kinds of scaffolding products and formwork systems. We export large quantity to Europe, Australia, New Zealand, U.S.A., Canada, South America and African countries. More than 20 years experience of manufacturing on scaffolding has won our customers approval and satisfaction.

Please be advised and see the attached catalogue of  the products which we are producing: 
1)SCAFFOLDING TUBES AND COUPLERS; 
2)SCREW JACKS;  
3)RINGLOCK SYSTEMS; 
4)KWIKSTAGE SYSTEMS;  
5)HAKI SYSTEMS; 
6)ADJUSTABLE STEEL PROPS  
7)FORMWORK AND FORMWORK ACCESSORIES; 
8)ALUMINIUM /STEEL FORMWORK


If you have any inquiry or any projects in hand ,please feel free to contact with me .


------------------
Cherry Wei
Sales Manager
QINGDAO SCAFFOLDING CO.,LTD.
QINGDAO FORMWORK INTERNATIONAL CO., LTD.
 
































 

About the Supplier

This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR255206". Items marked "verified" are certified.

Watch Video
Watch Video
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.
Qingdao Scaffolding Import and Export Co., Ltd.

About Our Factory & Business Background

Address
Room 2206.2210, Century Mansion, 39 Donghaixi Road, Qingdao,China.
Terms of Payment
LC, T/T
International Commercial Terms(Incoterms)
FOB, CFR, CIF, DDP
Average Lead Time
Peak Season Lead Time, 1-3 months, Off Season Lead Time, one month
Nearest Port
Qingdao, Tianjin, Shanghai

Our Production Capability & Technical Expertise

Main Products
Formwork, Slab Formwork, Scaffolding, Scaffold, Concrete Shoring, Wall Formwork, Column Formwork, Steel Props, Deck Formwork, Shoring

Our Industry Experience & Global Business Record

Export Year
2003-09-10
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe

FAQ

What is the typical work output per day?
A team of 3-4 workers can achieve 60-80 square meters of work per day.
Does this system require cross braces?
No, the system does not require cross braces or tripods.
What is the lead time for delivery?
Lead time is one month during off-peak season and 1-3 months during peak season.
What payment terms are accepted?
We accept LC and T/T payment terms.
Is this suitable for beam-less structures?
Yes, it is a perfect solution for flatslab or beam-less concrete structure projects.
What is the weight of the main panel?
The standard panel (1.8x1.2M) weighs 45kg.
What certifications does the product have?
The product holds ISO certification and a patent certificate.
Where are the products shipped from?
Products are shipped from Qingdao, Tianjin, or Shanghai ports.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now