Durable Reusable Cost-Effective Slab Formwork for Construction Project

Product Details
Customization: Available
Certification: ISO, CE
Material: Steel
Manufacturer/Factory, Trading Company, Group Corporation

360° Virtual Tour

Diamond Member Since 2008

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Multi-language Pioneer
5 languages freely used by foreign trade staff. include: English, Japanese, German, Italian, French
to see all verified strength labels (18)
  • Durable Reusable Cost-Effective Slab Formwork for Construction Project
  • Durable Reusable Cost-Effective Slab Formwork for Construction Project
  • Durable Reusable Cost-Effective Slab Formwork for Construction Project
  • Durable Reusable Cost-Effective Slab Formwork for Construction Project
  • Durable Reusable Cost-Effective Slab Formwork for Construction Project
  • Durable Reusable Cost-Effective Slab Formwork for Construction Project
Find Similar Products

Basic Info.

Model NO.
Green
Type
Slab Formwork
Transport Package
Pallet
Trademark
GF
Origin
China
Production Capacity
400tons/Month

Product Description

Panel - Prop early stripping Green Formwork System  -  Aluminium Formwork / Steel Formwork

Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world.  We call it Green Formwork-- Panel-Prop Early Stripping System . 

It has unbeatable advantages. 
 

SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple.  With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.

 
There are 3 basic components in Green Formwork System,do not require braces:
 

1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool

 
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
 
If you have projects in hand ,please do not hesitate to contact us.
We are committed to Excellent Services, Innovation & Quality Enhancement.

 
Durable Reusable Cost-Effective Slab Formwork for Construction Project
Durable Reusable Cost-Effective Slab Formwork for Construction Project
Durable Reusable Cost-Effective Slab Formwork for Construction Project

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier