QS Attached Lifting Metal Pallets 2m/3.6m, 1.75m/3m, 2.2m/4m Scaffolding Price Steel Props
Contact Supplier
Product Highlights
- Early Stripping Mechanism: Reduces construction period, saves time, and lowers total cost by minimizing panel count.
- High Erection Speed: Achieves 60-100 square meters per person per day with simple set and removal.
- Stable Independent Design: Features 6-direction moving restriction for maximum safety and stability.
- Minimal Operator Requirement: Only 3-4 workers needed to quickly and easily set up and remove panels.
- Multi-Standard Compliance: Manufactured according to European, American, and Australian standards.
- Global Application: Widely used in mining, construction, and petrochemical industries worldwide.
- Customizable Materials: Available in Steel, Aluminium, and Plywood based on project needs.
- Surface Finish Options: Offers Hot Dipped Galvanized and Powder Coated surface treatments.
Product Attributes
- Customization
- Available
- After-sales Service
- Quality Warranty
- Warranty
- Quality Warranty
- Model NO.
- Green Formwork
- Material
- Steel
- Type
- Fixed
- Structural Style
- Tower Scaffolding
- Framework
- Frame Combined Scaffolding
- Supporting Mode
- Projecting Scaffolding
- Lapping Form
- High Formwork
- Erection Position
- Internal Scaffolding
- Move Method
- Attached Lifting Scaffolding
- Scaffolding Part Type
- Scaffolding Props
- Construction Properties
- Building Scaffold
- Material.
- Steel, Aluminium, Plywood
- Surface
- Hot Dipped Galvanized, Powder Coated
- Brand
- QS
- Place of Orgin
- China
- Transport Package
- Metal Pallets
- Specification
- 2m/3.6m, 1.75m/3m, 2.2m/4m
- Trademark
- QS
- Origin
- China
- HS Code
- 73084000
- Production Capacity
- 2000tons/Year
Product Images of QS Attached Lifting Metal Pallets 2m/3.6m, 1.75m/3m, 2.2m/4m Scaffolding Price Steel Props
Find Similar Products
Product Description
It has unbeatable advantages.
SAFE -The independent table with 6 directions moving restriction.It's a very stable system.
EFFICIENT - It includes only few components, set and removal are very simple. With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced.
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
Qingdao Scaffolding I&E Co., Ltd. and Qingdao Formwork International Co.,Ltd. are one of the biggest manufacturer in whole China for Scaffolding systems and Formwork Systems.
All our products are made as per European standard, American standard and Australian standard.
For more than 20 years, our products are widely used in the mining, construction, petrochemical and even industries all over the world:especially in whole Europe, Australia, New Zealand, U.S.A., Canada , South American countries and Southeast Asia countries.
We have opened 5 branch companies in Germany( Round GMBH),Australia (Round Scaffolding Pty Ltd.), Sweden(RILLCO),USA(Round Formwork and Scaffolding Inc),Cambodia(Round Formwork and Scaffoldings Co.,Ltd), and 5 foreign offices: In France(QingDao Scaffolding Co.,Ltd),Brazil(QingDao Scaffolding Group ),Burma(QingDao Scaffolding Group),Indonesia(QingDao Scaffolding Group),Vietnam(QingDao Scaffolding Group).


Green Formwork:
Panel - Prop early stripping Green Formwork System - Aluminium Formwork / Steel Formwork
Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world. We call it Green Formwork-- Panel-Prop Early Stripping System .
There are 3 basic components in Green Formwork System,do not require braces:
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
| Item | Item | specification | unit weight |
| Aluminium Panel | MB1812 | 1.8X1.2M | 43 |
| MB189 | 1.8X0.9M | 37 | |
| MB186 | 1.8X0.6M | 29 | |
| MB1512 | 1.5X1.2M | 39.4 | |
| MB159 | 1.5X0.9M | 31.3 | |
| MB156 | 1.5X0.6M | 23.8 | |
| MB1212 | 1.2X1.2M | 32 | |
| MB129 | 1.2X0.9M | 26 | |
| MB126 | 1.2X0.6M | 21 | |
| MB99 | 0.9X0.9M | 21 | |
| MB96 | 0.9X0.6M | 17 | |
| MB66 | 0.6X0.6M | 12.3 |
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
If you have projects in hand ,please do not hesitate to contact us.




About the Supplier
This supplier has been audited by BV. Verify the report on the official BV website with ID "MIC-ASR255206". Items marked "" are certified.
Company Profile
Qingdao Scaffolding Import and Export Co., Ltd., has been manufacturing scaffolding and formwork products for more than 30 years, absolutely top 1 for high quality scaffolding and formwork products amoung all Chinese and Indian suppliers.
We are providing various products and solutions of slab formwork, wall formwork, formwork accessories, ringlock scaffolding, kwikstage scaffolding, haki scaffolding, scaffolding couplers, steel tubes and steel props.
All our products are made as per European standard, American standard and Australian standard.
For more than 20 years, our products are widely used in the mining, construction, petrochemical and even industries all over the world: Especially in whole Europe, Australia, New Zealand, U. S. A., Canada, South American countries and African countries.
Green Formwork is our invention patent formwork system. It is an effective replacement of conventional timber method for concrete construction. It has unbeatable advantage such as safety, high efficiency, and reduced construction cost and labor. Green Formwork system is simple and innovative. Till now, it has been used for more than 600 projects in USA, Canada, Czekh republic, Iraq, Malaysia, Indonesia, Philippines, Thailand, Burma, U. A. E, Cambodia.
About Our Factory & Business Background
- Address
- Room 2206.2210, Century Mansion, 39 Donghaixi Road, Qingdao,China.
- Terms of Payment
- LC, T/T
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, DDP
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month - Nearest Port
- Qingdao, Tianjin, Shanghai
Our Production Capability & Technical Expertise
- Main Products
- Formwork, Slab Formwork, Scaffolding, Scaffold, Concrete Shoring, Wall Formwork, Column Formwork, Steel Props, Deck Formwork, Shoring
Our Industry Experience & Global Business Record
- Export Year
- 2003-09-10
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe
FAQ
- What is the erection speed of the system?
- The erection speed is as high as 60-100 square meters per person per day.
- How many workers are needed to operate the system?
- A team of 3-4 workers can quickly and easily set up and remove the panels.
- What standards do your products comply with?
- All products are made as per European standard, American standard, and Australian standard.
- What materials are available for the formwork?
- Customization options include Steel, Aluminium, and Plywood materials.
- What is the lead time for production?
- Peak season lead time is 1-3 months, while off-season lead time is one month.
- What payment terms are accepted?
- We accept LC and T/T for payment.
- What are the available surface finishes?
- Surface options include Hot Dipped Galvanized and Powder Coated.
- Where are your branch companies located?
- We have 5 branch companies in Germany, Australia, Sweden, USA, and Cambodia, plus 5 foreign offices.
Send your message to this supplier
People who viewed this also viewed
-
US$3.00-20.00 / Piece
-
US$3.00-30.00 / Piece
-
US$5.00-20.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Props / Shoring systems
- QS Attached Lifting Metal Pallets 2m/3.6m, 1.75m/3m, 2.2m/4m Scaffolding Price Steel Props
Related Categories
Hot Searches
- China Formwork Factories
- Frame System Factories
- Frame Construction Factories
- China Scaffold Factories
- Props System
- Building Scaffolding Props
- Scaffolding Formwork Frame
- Scaffold Steel Props
- Scaffolding Props Formwork System
- Top 10 Formwork
- Formwork Trends
- Steel Props Bulkbuy