• Slab Formwork with Drop Head for Concrete Construction
  • Slab Formwork with Drop Head for Concrete Construction
  • Slab Formwork with Drop Head for Concrete Construction
  • Slab Formwork with Drop Head for Concrete Construction
  • Slab Formwork with Drop Head for Concrete Construction
  • Slab Formwork with Drop Head for Concrete Construction

Slab Formwork with Drop Head for Concrete Construction

Material: Bamboo Plywood with Steel Frame Panel
Usage: No Beam Structure Buildings;Underground Garage
Customized: Customized
Size of Biggest Panel - 1.8*1.2m: Unit Weight of The Biggest Panel - 40kg
Transport Package: in Bundle or Others
Specification: 1.8X1.2M
Customization:
Diamond Member Since 2008

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
QS
Trademark
QS
Origin
Shandong, China
HS Code
7308
Production Capacity
400 Tons / Month

Product Description

Slab Formwork with Drop Head for Concrete Construction

Panel - Prop early stripping Green Formwork System  -  Steel Formwork

 
Based on the concept of Green Construction,and for the study of 10 years,we have developed the panel-prop system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world.  We call it Green Formwork-- Panel-Prop Early Stripping System to you. 

It has unbeatable advantages. 
 
SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple.            With early stripping mechanism,it can shorten the construction period and save your time. 
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - Group together in fours, quick and easy to set up these tables. 
 
There are 3 basic components in Green Formwork System:
 
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
 
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
 
If you have projects in hand ,please do not hesitate to contact us.
Slab Formwork with Drop Head for Concrete Construction
Slab Formwork with Drop Head for Concrete Construction
Slab Formwork with Drop Head for Concrete ConstructionSlab Formwork with Drop Head for Concrete Construction
Slab Formwork with Drop Head for Concrete ConstructionSlab Formwork with Drop Head for Concrete Construction
Slab Formwork with Drop Head for Concrete Construction

 

Slab Formwork with Drop Head for Concrete ConstructionSlab Formwork with Drop Head for Concrete Construction

If you have any inquiry about scaffolding or formwork products,please feel free to contact me.

------------------
Cherry Wei
Sales Manager
QINGDAO SCAFFOLDING CO.,LTD.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2008

Suppliers with verified business licenses

Trading Company
Number of Employees
33
Year of Establishment
2003-09-10