• Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
  • Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
  • Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
  • Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
  • Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab

Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab

Certification: Patent Certificate
Material: Steel Wood
Type: Slab Formwork
Transport Package: in Bundle or Others
Specification: Different sizes
Trademark: QS GF
Customization:
Diamond Member Since 2008

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
QS GF
Origin
Shandong, China
HS Code
7308
Production Capacity
400 Tons / Month

Product Description

Panel - Prop early stripping Green Formwork System  -  Steel Formwork

Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world.  We call it Green Formwork-- Panel-Prop Early Stripping System . 

It has unbeatable advantages. 
 
SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple.  With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
 
There are 3 basic components in Green Formwork System,do not require braces:
 
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
 
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
 
If you have projects in hand ,please do not hesitate to contact us.

Panel - Prop early stripping Green Formwork System  -  Steel Formwork

Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world.  We call it Green Formwork-- Panel-Prop Early Stripping System . 

It has unbeatable advantages. 
 
SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple.  With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
 
There are 3 basic components in Green Formwork System,do not require braces:
 
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
 
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
 
If you have projects in hand ,please do not hesitate to contact us.
Panel - Prop early stripping Green Formwork System  -  Steel Formwork

Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Prop formwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high eggiciency and solid safety.It's a new invention, the most advanced Early Stripping System in the world.  We call it Green Formwork-- Panel-Prop Early Stripping System . 

It has unbeatable advantages. 
 
SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple.  With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.
 
There are 3 basic components in Green Formwork System,do not require braces:
 
1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool
 
Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
 
If you have projects in hand ,please do not hesitate to contact us.


Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
Green Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab
Green Formwok Fast Efficient and Easy Operating Slab Formwork for FlatslabGreen Formwok Fast Efficient and Easy Operating Slab Formwork for Flatslab



Company Introduction

Our company  "QINGDAO SCAFFOLDING CO.,LTD."  is one of the biggest manufacturers in whole China 
for scaffolding products and formwork items. We export large quantity to Europe, Australia, New Zealand, U.S.A., Canada, South America and African countries. More than 20 years experience of manufacturing on scaffolding has won our customers approval and satisfaction.
 
Please be advised the main products which we are producing: 
1)SCAFFOLDING COUPLERS; 
2)SCREW JACKS;  
3)RINGLOCK SYSTEMS; 
4)KWIKSTAGE SYSTEMS;  
5)HAKI SYSTEMS; 
6)PROPS  
7)FORMWORK AND FORMWORK ACCESSORIES; 
8)SCAFFOLD TUBES(PIPES)
9)STEEL FORMWORK

If you have any inquiry about scaffolding or formwork products,please feel free to contact me.

QINGDAO SCAFFOLDING CO.,LTD.

Best Regards/Cherry Wei
M: 0086-13355422605

TEL: +86-532-8668 1339
FAX: +86-532-8579 8559

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2008

Suppliers with verified business licenses

Trading Company
Number of Employees
33
Year of Establishment
2003-09-10